The following column is the Road Watch report for Hendry County for the week beginning Sunday, July 26
Join our family of readers for as little as $10 per month and support local, unbiased journalism.
Already have an account? Log in to continue. Otherwise, follow the link below to join.
Please log in to continue |
The following column is the Road Watch report for Hendry County for the week beginning Sunday, July 26, provided by the Florida Department of Transportation.
Motorists are reminded to wear safety belts and drive with caution, courtesy, common sense, and patience as they travel through work zones. Remember, speeding fines are doubled in work zones.
The Florida Department of Transportation (FDOT) will temporarily close the S.R. 29 (Bridge Street) LaBelle Drawbridge over the Caloosahatchee River for essential repairs.
Motorists should plan for a full weekend closure, weight restrictions, and local detours, Friday, July 24 – Monday, July 27.
Full Weekend Bridge Closure
The bridge will be completely closed to all traffic during the following times:
Detour Routes
Law enforcement will be on-site to direct traffic and enforce restrictions. Please follow posted signs:
Local passenger car traffic may utilize Fort Denaud Road as a localized bypass.
Trucks are strictly prohibited from this route.
Regional Detour (All Commercial Trucks & Heavy Vehicles)
Due to weight limits and turning constraints on local roads, all commercial trucks and heavy vehicles must utilize the 53-mile regional detour via state roadways:
Important Restrictions & Weekday Delays
Driver Tip: Please allow extra travel time, watch for law enforcement, and work crews, or use alternate routes when possible. Utilize regional navigation tools like FL511.com, mobile mapping applications, or GPS devices to monitor real-time traffic conditions.
Districtwide Movable Bridges (Hendry County): (Construction Project) The Florida Department of Transportation began installing Intelligent Transportation Systems (ITS) at S.R. 29 (Bridge Street) Caloosahatchee River Bridge (Labelle) in Hendry County. This project includes the installation of pedestrian/bicycle detection systems, conduits and electrical components, and connection to bridge tender buildings.
Variable message signs will be in place to alert drivers that work is underway. Estimated completion of testing is in late May 2026, weather permitting.
S.R. 25 (U.S. 27) from Stitt Ranch to West of Flaghole Road: (Construction project) Crews will begin milling and resurfacing work on S.R. 25 (U.S. 27) from Stitt Ranch to west of Flaghole Road in Hendry County. The project includes guardrail improvements, drainage enhancements, updated signage, and new pavement markings.
Estimated completion is the summer of 2026.
As a reminder, travelers can visit www.FL511.com or dial “511” from their phone to learn about traffic conditions on major roadways across the state.