Road Watch for Glades County

Posted 12/5/19

Motorists are reminded to wear safety belts and drive with caution, courtesy, common sense, and patience as they travel through work zones. Remember, speeding fines are doubled in work zones.

• …

You must be a member to read this story.

Join our family of readers for as little as $5 per month and support local, unbiased journalism.


Already have an account? Log in to continue. Otherwise, follow the link below to join.

Please log in to continue

Log in
I am anchor

Road Watch for Glades County

Posted

Motorists are reminded to wear safety belts and drive with caution, courtesy, common sense, and patience as they travel through work zones. Remember, speeding fines are doubled in work zones.

U.S. 27 from Fifth Street to north of S.R. 78: (Construction project) Crews will be milling and resurfacing the roadway on U.S. 27 from Fifth Street to north of S.R. 78 in Moore Haven. Additional work includes improving the drainage, sidewalks and road shoulders, and installing curb and gutter, signage and pavement markings, and water and sewer lines along U.S. 27. Work also includes replacing traffic signals at 6th Street and 10th Street and adding new streetlights at 10th Street and S.R. 78 intersections. Motorists should expect periodic nighttime and daytime lane closures on U.S. 27 during construction.
· Motorists should expect 24-hour eastbound and westbound lane closures on U.S. 27 from west of Graham Road to Fifth street. Crews will be milling and paving on U.S. 27 from the acceleration lane at S.R. 78 to 5th street. One lane in each direction will be closed at a time in three-mile sections.

Please use caution and watch for workers in the construction zone. Estimated project completion is summer 2020. The contractor is AJAX Paving Industries of Florida.

S.R. 78 from Fish Eating Creek to Lakeport City limits: (Maintenance project) Crews will be landscaping near the roadway from 8 a.m. to 5 p.m. Monday through Thursday, weather permitting. Motorists should use caution as crews work near and on the roadway.

S.R. 78 Ortona at the Vulcan Sand Mine Entrance: (Maintenance project) Motorists should expect intermittent eastbound lane closures during daytime hours while crews repair drainage structures near the roadway, weather permitting. Motorists should use caution as crews work near the roadway.

road-closure, road-watch, traffic

Comments

x