SR29 LaBelle Drawbridge over the Caloosahatchee River Public Information Meeting Scheduled for May 2

Posted 5/1/17

The Florida Department of Transportation (FDOT), District One, is holding a public information meeting to discuss the upcoming proposed structural improvements to the State Road 29 LaBelle Drawbridge …

You must be a member to read this story.

Join our family of readers for as little as $5 per month and support local, unbiased journalism.


Already have an account? Log in to continue. Otherwise, follow the link below to join.

Please log in to continue

Log in
I am anchor

SR29 LaBelle Drawbridge over the Caloosahatchee River Public Information Meeting Scheduled for May 2

Posted

The Florida Department of Transportation (FDOT), District One, is holding a public information meeting to discuss the upcoming proposed structural improvements to the State Road 29 LaBelle Drawbridge over the Caloosahatchee River in Hendry County, Florida. The meeting will be held Tuesday, May 2, 2017, from 5 p.m. to 7 p.m. at the LaBelle Civic Center, 481 West Hickpochee Avenue, LaBelle, Florida 33935.

The meeting will be an open house format, no formal presentation will be made. Those attending the meeting will be able to view displays, ask questions, and discuss the work one-on-one with members of the project team.

The proposed improvements include strengthening the steel and concrete beams of the bridge. “The bridge has weight restrictions and commercial vehicles over the weight limit are not permitted to use the bridge and must go to the Mamie Langdale Memorial Bridge in Moore Haven to find an alternate crossing.

Construction is tentatively scheduled to start in spring 2018 with completion estimated by late 2018. During construction, motorists can expect periodic intermittent lane closures and full closures, which will limit or prohibit all vehicles on the bridge.

fdot, featured

Comments

x